Wu2008: Location and Ride Sharing
From CONTENTdm Users Wiki
[edit] scaffolding
The management of mobile scaffolding
1. Establish and improve the leading scaffolding tools made of materials, recovery, inspection, maintenance rail system, according to who uses, who repairs, who the principle of governance, the implementation of quota recipients or lease method to reduce the loss and loss.
2. Where the bending deformation of the rod should be straightened, damaged components should be repaired in order warehouse storage, or should be replaced.
3. Use of mobile scaffolding should be completed timely recovery of storage, classified storage. Open dumps, the site should be smooth, good drainage, under the support pad, and covered with a sheet, accessories, parts should be stored indoors.
4. Instrumental in the removal of mobile scaffolding for maintenance after the need for timely protection and supporting storage.
5. Move the scaffolding used in fasteners, plate, bolt and other small parts can easily be lost in the branch should take timely recovery of the excess parts store, also in time when the dismantling of acceptance, not chaos is still lying about.
6. To schedule mobile scaffolding accessories for rust, rust treatment, all areas of high humidity (greater than 75%) coated with anti-rust paint once a year should normally be two years of brushing time. Bolts should be galvanized rust. Where there is no prerequisite for zinc should be in the wash after each use kerosene, oil rust in the paint.
Jan. 17 more knowledge of scaffolding and aluminum beam description, please visit this site and the scaffolding bbs to the website: http://www.iscaffold.com.cn 24 hour customer service phone!
link:>> Christian Louboutin Shoes sale | waterproof connectors

